Overview
Caltrain owns and maintains the San Francisquito Creek Railroad Bridge located between Menlo Park and Palo Alto. In 2023, severe storms caused significant erosion along the creek bank adjacent to the rail corridor. To prevent further erosion and protect critical infrastructure ahead of the winter storm season, Caltrain implemented temporary stabilization measures in 2023.
Building on that work, the San Francisquito Creek Bank Stabilization Project is a partnership between Caltrain and the Cities of Menlo Park and Palo Alto to reinforce and restore a permanent creek embankment. The bank stabilization will include permanent erosion control measures including soil excavation, installation of boulders with native plantings to prevent erosion, and reinforcing earthen slopes along the creek. Additionally, an existing storm drain will be replaced and a new manhole and backflow prevention system will be installed.
This project will protect the Caltrain rail bridge as well as the bicycle and pedestrian bridge from future storm impacts and erosion..
Upcoming Virtual Community Meeting
Please join Caltrain for a virtual community meeting with the Cities of Menlo Park and Palo Alto to learn about the upcoming San Francisquito Creek Bank Stabilization Project. Information on the need for the project, the important benefits, and the construction activities will be discussed, followed by an opportunity for residents to ask questions.
Thursday, May 7, 2026
5:30 – 6:15 PM
Virtual Zoom Meeting
Register HERE
Webinar ID: 832 1392 5284 Passcode: 736697