San Carlos Station

San Carlosas of 1:58 PM
SOUTHBOUND
NORTHBOUND
152Local47 min.
254Limited79 min.
156Local107 min.
151Local2 min.
155Local60 min.
257Limited70 min.

This display provides the train number, train type and countdown prediction to departure and refreshes every 60 seconds automatically. In the event of a service delay, predictions may be suspended accompanied by rider notifications above. Note: Real-time FAQs and Mobile Device Station List

Transit Village Construction Project Update at San Carlos Caltrain Station

Starting Monday, April 2, 2018, at 6 a.m., the entrance to the plaza area in front of the station depot off El Camino Real and San Carlos Avenue will be permanently closed to traffic, except for construction vehicles.

Passenger drop offs or pickups will NOT be allowed in this area. Please use the new Transit Center parking lot accessible from El Camino Real and Olive Street. Allow yourself extra time to meet your train.

Pedestrian Access

A pedestrian walkway through the plaza area accessible from El Camino Real and San Carlos Avenue gives Caltrain patrons access to the north and southbound Caltrain platforms.

The mixed-use transit-oriented project, the San Carlos Transit Village, is a joint development between SamTrans and Prometheus Real Estate Group. For information about the San Carlos Transit Village Project, visit www.samtrans.com/SCTC.

Download map (PDF)


San Carlos Station

Zone 2

599 El Camino Real, San Carlos 94070
Google Maps™ Trip Planner

San Carlos Station

Train schedules:


 

Vendors:
Depot Cafe

Transit Connections
SamTrans: ECR, KX, 260295397, 398FLX San Carlos 
Shuttles: Electronic Arts, Oracle, Redwood Shores Twin Dolphin Area, Redwood Shores (Clipper)
SHUTTLE LOCATIONS: The Electronic Arts and Oracle Caltrain shuttles are located east of the San Carlos Caltrain Station to Old County Rd. The stop is near the northbound platform ramp. The Redwood Shores Twin Dolphin Area and Clipper Shuttles serve the west side shuttle stop.

Wheelchair Accessible 
Yes

Bicycle Parking:
36 Bike racks
48 Lockers - Check availability and access application HERE 

Parking
See construction notice above; pay through ticket vending machine

Ticket Vending Machines
4 machines

Recycling
Caltrain makes being sustainable easy.  Customers are encouraged to place paper, glass/cans, food and trash in the same waste container.  The contents make their way to Newby Island Resource Recovery Park where machinery and trained staff sort all contents for appropriate recycling or landfill.

Public Telephone
1 on southbound platform

7/18/17 - rjc