|
Project Study Report
City of San Bruno
Project Study Report (PDF, 2 MB)
Appendix A - Existing Conditions (PDF, 37.10 MB)
Appendix B - Project Plan and Project Design Criteria (PDF, 30.49 MB)
Appendix C - Track Plan, Data and Sections (PDF, 5.69 MB)
Appendix D - Grade Separation and Structures (PDF, 4.21 MB)
Appendix E - San Bruno Station and Platforms (PDF, 1.98 MB)
Appendix F - Existing BART Facilities and Bridge Structures (PDF, 165.5 KB)
Appendix G - Utilities (PDF, 8.07 MB)
Appendix H - Traffic Analysis (PDF, 879.9 KB)
Appendix I - Preliminary Right-of-Way Maps (PDF, 6.36 MB)
Appendix J - Construction Staging (PDF, 18.07 MB)
Appendix K - Signalization of Tracks (PDF, 72.7 KB)
Appendix L - Environmental Review (PDF, 388.6 KB)
Appendix M - Project Implementation Schedule (PDF, 102.3 KB)
Appendix N - Cost Estimate (PDF, 67.1 KB)
Appendix O - Overpass Alternative Study (PDF, 22.14 MB)
Appendix P - Chronology of Events, CAC Minutes and Correspondence (PDF, 46.3 KB)
Appendix P - Chronology of Events, CAC Minutes and Correspondence (PDF, 5.39 MB)
Appendix Q - CPUC Application (PDF, 3.06 MB)
|