Installation of temporary shoring at the Pedestrian Underpass. Sheet piles, or steel sheets, are used to create a retention system/wall that provides lateral support.


Installation of Cast-in-Drilled-Hole (CIDH) Piles at 31st Avenue.


Installation of Cast-in-Drilled-Hole (CIDH) Piles at Borel Creek.

Crews form the pile cap at the Pedestrian Underpass.

Pile cap with the wooden forms removed.

Paving of the temporary parking lot.


Installation of lighting at the temporary parking lot.