Peninsula Corridor Electrification Project (PCEP) Draft Environmental Impact Report (DEIR), February 2014

Cover Page
Title
Executive Summary
Table of Contents
Chapter 1: Introduction
Chapter 2: Project Description
Chapter 3: Settings, Impacts, and Mitigation Measures
3.1:  Aesthetics, Part 1
3.1:  Aesthetics, Part 2
3.2:  Air Quality
3.3:  Biological Resources
3.4:  Cultural Resources
3.5:  Electromagnetic Fields and Electromagnetic Interference
3.6:  Geology, Soils, and Seismicity
3.7:  Greenhouse Gas Emissions and Climate Change
3.8:  Hazards and Hazardous Materials
3.9:  Hydrology and Water Quality
3.10: Land Use and Recreation
3.11: Noise and Vibration
3.12: Population and Housing
3.13: Public Services and Utilities
3.14: Transportation and Traffic
Chapter 4: Other CEQA-Required Analysis
Chapter 5: Alternatives
Chapter 6: Report Preparation
Chapter 7: References
Appendix A  NOP and Scoping Summary Report
Appendix B  Air Quality and Greenhouse Gas Analysis Technical Data
Appendix C  Noise and Vibration Technical Report
Appendix D  Transportation Analysis
Part 1
Part 2
Part 3
Part 4
Part 5-Attachments A-D
Part 6-Attachments E-F
Part 7-Attachments G-I
Appendix E  Cultural Resources Programmatic Agreement
Appendix F  Tree Inventory and Canopy Assessment
Appendix G  Biological Resources Information
Appendix H  Land Use Information
Appendix I   Ridership Technical Memorandum

To Download Full Document
2014 PCEP DEIR Full Document (74.18MB)
2014 PCEP DEIR Appendices (88.12MB)

Notice of Availability (NOA) of PCEP Draft Environmental Impact Report and Public Meetings

Notice of Availability of Draft Environment Report and Public Meetings
Información en Español
有關中文資料
Thông tin bằng tiếng Việt

PCEP Public Scoping, January 31, 2013-March 18, 2013

PCEP Scoping Summary Report
PCEP Scoping Summary Appendix
Notice of Preparation of an Environmental Impact Report (EIR) January 31. 2013
Public Scoping Meeting Video







2/28/14 - dc