Caltrain/HSR Blended Service Plan/Operations Considerations Analysis


Key Considerations:

This study addresses stakeholder interest in studying different modernized Caltrain and blended system operating scenarios, including various blended system passing track options.

This analysis concluded that all of the tested options are viable as simulated in the model, however, the simulation also revealed that there are notable performance differences between the options examined.

As planning for the blended system continues, additional due diligence will be needed to confirm the performance of the options considered relative to real world system operations.

To download the Caltrain/HSR Blended Service Plan/Operations Consideration Analysis, please click
here. (PDF, 2.06MB)
To download the Caltrain/HSR Blended Service Plan/Operations Consideration Analysis Appendix, please click
here. (PDF, 13.5MB)

 

7/2/13 - CF