Caltrain Construction and Maintenance: Aug. 11 to Aug. 17, 2012
Caltrain Construction and Maintenance: Aug. 11 to Aug. 17, 2012
Construction
San Bruno Grade Separation Project
Pile driving is scheduled to continue this week. Pile driving will be limited to weekday daytime hours from 9 a.m. to 3 p.m. The work will involve excavation, drilling and machines that hammer or drive columns into the ground. A total of 100 piles will be driven into the ground over the course of three weeks. At times, noise levels could be as high as 75 decibels, and we apologize for any inconvenience this may cause.
Other work, which includes digging with a backhoe and mini-excavator, will be done in the daytime from 7 a.m. to 4 p.m. Crews will excavate, grade, install utility infrastructure, and pour concrete. Crews will use medium and heavy duty diesel vehicles to transport dirt and concrete.
Night work will occur from Saturday, Aug. 11, through Friday, Aug. 17, between 11 p.m. and 7 a.m. Crews will excavate, place steel bridge structures and remove shoring.
The $147 million project will elevate the Caltrain tracks above three existing at-grade street crossings at San Bruno, San Mateo and Angus Avenues. A new elevated Caltrain station between San Bruno and San Mateo Avenues will replace the station at Sylvan Avenue.
For more information, please call the dedicated outreach line at 650.508.7726 or email sbgradesep@caltrain.com.
Maintenance
Caltrain will perform routine maintenance at several locations next week. To avoid delays to passengers, the work will take place Saturday through Friday from 8 p.m. to 6 a.m. There will be some construction noise but crews will work as quietly as possible. For more information about this type of work, click here.
San Francisco
Sunday, Aug. 12, crews will weld and grind tracks at the San Francisco station.
South San Francisco to Millbrae
Sunday, Aug. 12, through Friday, Aug. 17, crews will excavate and grade between the South San Francisco and Millbrae stations.
San Francisco to San Jose
Monday, Aug. 13, through Friday, Aug. 17, crews will operate a special night train to inspect the tracks for defects between the San Francisco and San Jose stations.
San Francisco to South San Francisco
Monday, Aug. 13, through Thursday, Aug. 16, crews will weld and grind tracks between the San Francisco and South San Francisco stations.
Redwood City to Palo Alto
Sunday, Aug. 12, crews will operate medium duty on-track machinery to remove and replace ties between the Redwood City and Palo Alto stations.
Palo Alto to Sunnyvale
Sunday, Aug. 12, crews will operate medium duty on-track machinery to grind and align tracks between the California Avenue and Sunnyvale stations.
Mountain View to Sunnyvale
Sunday, Aug. 12, crews will operate medium duty on-track machinery to grind and align tracks between the Mountain View and Lawrence stations.
Sunnyvale to Santa Clara
Monday, Aug. 13, through Thursday, Aug. 16, crews will operate medium duty on-track machinery to remove and replace ties, and grind and align tracks between the Lawrence and Santa Clara stations.
Sunnyvale to San Jose
Sunday, Aug. 12, crews will operate medium duty on-track machinery to grind and align tracks between the Sunnyvale and San Jose stations.
###
Contact: Tasha Bartholomew, 650.508.7927