Caltrain Construction and Maintenance: April 28 to May 4, 2012
Caltrain Construction and Maintenance: April 28 to May 4, 2012
Construction
San Bruno Grade Separation Project
Pile driving, which began in February, is currently on hold. Other work, which includes digging with a backhoe and mini-excavator will be done from 7 a.m. to 4 p.m. Crews will install temporary shoring, rebar, prepare foundations, and pour concrete. Crews will use medium and heavy duty diesel vehicles to prepare and transport concrete.
Night work will occur from Sunday, April 29, through Friday, May 4, between 11 p.m. and 7 a.m. Crews will install temporary shoring in preparation for building foundations and retaining walls.
The $147 million project will elevate the Caltrain tracks above three existing at-grade street crossings at San Bruno, San Mateo and Angus Avenues. A new elevated Caltrain station between San Bruno and San Mateo Avenues will replace the station at Sylvan Avenue.
For more information, please call the dedicated outreach line at 650.508.7726 or email sbgradesep@caltrain.com.
Maintenance
Caltrain will perform routine maintenance at several locations next week. To avoid delays to passengers, the work will take place Sunday through Thursday from 8 p.m. to 6 a.m. There will be some construction noise but crews will work as quietly as possible. For more information about this type of work, click here.
San Francisco
Saturday, April 28, crews will install a new narrowband radio antenna at the San Francisco station yard.
South San Francisco to San Bruno
Sunday, April 29, crews will install a new narrowband radio antenna between the South San Francisco and San Bruno stations.
South San Francisco to Millbrae
Sunday, April 29, through Friday, May 4, crews will excavate, grade, and install utilities between the South San Francisco and Millbrae stations.
San Bruno to Belmont
Sunday, April 29, crews will operate light on-track machinery to grind and align tracks between the San Bruno and Belmont stations.
Hillsdale to Santa Clara
Monday, April 30, through Friday, May 4, crews will operate light on-track machinery to grind and align tracks between the Hillsdale and Santa Clara stations.
San Carlos
Monday, April 30, crews will install a new narrowband radio antenna at the San Carlos station.
Redwood City to Palo Alto
Monday, April 30, crews will operate light on-track machinery to remove and replace ties between the Redwood City and Palo Alto stations.
Santa Clara to San Jose
Sunday, April 29, through Thursday, May 3, crews will weld and grind tracks between the Santa Clara and San Jose stations.
###
Media Contact: Christine Dunn, 650.508.6238